During culvert replacements south of Porter, Hwy 68 will be detoured to County Roads 7 and 19. The south detour will not start until the north detour has been removed.

Porter detour begins August 18 for Hwy 68 Minneota to Marshall project

Construction to replace two culverts north of Porter begins Thursday, August 18 as part of the Highway 68 Minneota to Marshall project. The roadway will be closed from 230th Street north of Porter to Porter’s western city limits.

Traffic will be routed from Porter to Canby on County Road 7, County Road 20, and Highway 75. The detour will be in place approximately four weeks (see attached map for North Porter detour highlighted in blue).

All homes and businesses along the project route will remain accessible during construction. Watch for message boards on Hwy 68, future emails, and social media posts for updated information.

Additional traveler impacts

The main detour for Hwy 68 from Minneota to Marshall remains in place for the project duration. Traffic follows Hwy 19 to County Road 5 for Ghent access, and County Road 3 for Minneota access and return to Hwy 68 (see attached map for main detour highlighted in orange).

During culvert replacements south of Porter, Hwy 68 will be detoured to County Roads 7 and 19. The south detour will not start until the north detour has been removed.

Project summary

The project includes shoulder widening and culvert replacements along 11 miles of Hwy 68 from North Grant Street in Minneota to the Redwood River in Marshall. Drainage repairs near Porter are also part of the project.

Hwy 68 is currently 32 feet wide, with 4-foot paved shoulders and 12-foot driving lanes. After construction is complete, Hwy 68 will have wider shoulders between Minneota and Marshall by adding four feet of gravel on each side of the roadway. Project benefits include enhanced safety and repaired drainage.

The completion date is to be determined.

Work zone reminders

Slow down when approaching every work zone
Never enter a roadway that has been blocked with barriers or cones
Stay alert; watch for workers and slow-moving equipment
Obey posted speed limits; fine for a work zone violation is $300
Minimize distractions behind the wheel
Be patient and expect delays, especially during peak travel times
Stay connected

To sign up for project email or text updates visit mndot.gov/d8/projects/hwy68minneotatomarshall.
Join the Southwest Minnesota Facebook group for news, events, and updates
Follow us on Twitter @MnDOTsouthwest for news, events, and updates
For real-time traffic and travel information in Minnesota, visit www.511mn.org or get the free smartphone app at Google Play or the App Store

Contact Us

The Minneota Mascot
Address: 201 N. Jefferson
Minneota, MN 56264

Phone:(507) 872-6492